The loud version is a different machine than the one being built.

Water, noise, and heat get described as if Cedar Creek were a field of old cooling towers. The campuses published for Bastrop County are closed-loop buildings. Here is the claim, then the record.

Myth 01 · Water

They will drain the county dry.

The claim treats every data center like a legacy evaporative tower that boils fresh water all day, and then mixes that picture with the water used upstream to make electricity.

Same scale, gallons a year

  • 1,000 homes, high end

    146 million gal/year

    400,000 gallons a day, times 365

  • 18-hole golf course

    114 million gal/year

    Tomorrow Begins Here

  • Closed-loop campus

    5 million gal/year

    Tomorrow Begins Here

  • Pacifico, potable only

    About 730,000 gal/year

    2,000 gallons a day, times 365

The home and Pacifico yearly totals are the published daily figures times 365. They are shown so the scale is comparable. They are not a second set of official annual bills.

Building Bastrop County puts Pacifico’s potable use at about 2,000 gallons a day, counted as 23 living-unit equivalents. A residential use of that scale is put at about 3,000 LUEs. The same source says a 96-megawatt closed-loop building, the size of EdgeConneX’s published capacity, sits in roughly the same daily water range as a flagship Buc-ee’s.

Tomorrow Begins Here puts a modern closed-loop campus near 5 million gallons a year. An 18-hole golf course is about 114 million gallons a year. A 1,000-home subdivision is 300,000 to 400,000 gallons a day. All U.S. data centers together used less than 0.5% of national freshwater in 2023, about 15 times less than what leaks from municipal pipes, and irrigation uses on the order of 100 times more.

The Texas Association of Business puts every data center in the state combined at less than 0.5% of Texas water. It says newer facilities cool with air, recycle the same water, or use treated wastewater so drinking supplies stay in the system.

The Data Center Coalition’s FAQ says the cooling method is chosen for the local climate and for whether recycled water is on hand. It cites a Virginia legislative audit: 83% of data centers in that state use no more water than a large office building, which the FAQ puts at 6.7 million gallons a year, about 18,400 gallons a day. The industry’s own list of reductions is waterless cooling, closed-loop systems, and reclaimed water. That audit is Virginia. It is not a meter on these campuses.

The loop is the whole argument. Water stays in the pipe. It is not the cooling method that made the old reputation.

Myth 02 · Noise

It will roar like a highway at the fence.

The claim

Cooling fans run in the open, day and night, and the sound carries the way a factory or a crypto mine does.

The record

That sound belongs to open cooling towers and outdoor equipment yards. The design published for these campuses is closed-loop cooling inside the hall.

Pumps and fans exist. A data center is not a library. The myth skips the enclosure and the distance. Servers, coolant, and the heat exchanger sit in the building. EdgeConneX’s published Cedar Creek design is closed-loop chilled water with thermal storage, not a row of evaporative towers. Pacifico’s tract is 2,842 acres, so the equipment is inside a large site rather than on a residential lot line.

Construction is the loud chapter. Truck traffic and site work do not sound like the finished building. Once the hall is operating, the county is not living next to a subdivision of commuters either. Daily traffic is one of the things this land use is built to avoid.

The two source sites do not publish a decibel study for these campuses. This page will not invent one. What they do publish is the machine: a sealed cooling loop in a building, not an open tower farm at the fence.

The coalition’s FAQ cites that same Virginia audit on sound. The finding, as the FAQ reports it: low-frequency noise, not loud enough to damage hearing, and rarely loud enough to break a local noise ordinance. The coalition treats the complaints that do arise as specific to a site, not as the way every building behaves. That is still not a decibel reading for Cedar Creek.

Myth 03 · Heat

The waste heat will cook the next road over.

Chips do get hot. That heat is the reason the cooling system exists. It is not a plume dumped on the neighborhood, and it is not boiled off as lost water.

  1. 01

    The chips get hot

    Servers and GPUs make heat. That is the work, not a leak.

  2. 02

    Coolant takes it

    Liquid runs through the hardware and picks the heat up at the source.

  3. 03

    A heat exchanger moves it

    The heat leaves the loop. The fluids do not mix.

  4. 04

    The same water returns

    Sealed loop. No evaporation. No daily refill from the aquifer.

Building Bastrop County’s account of the exchanger is specific: heat moves, the fluids do not mix, and the same water recirculates. The outdoor equipment rejects that heat on the campus. It does not evaporate a river to do it. The water myth and the heat myth are one picture of a 1990s tower. Cedar Creek’s published design is the other machine.

Myth 04 · Power

They will take the grid and hand you the bill.

Pacifico is the direct answer. The campus includes 710 MW of natural gas generation on the property. Building Bastrop County describes that as no draw on the ERCOT grid and no rate impact from that design. Neighbors are not the power plant for that site. A post about fine particles treats a size chart and a stack inventory as a medical finding about that plant. The air page sets that inventory next to the county’s own year of roads, prescribed fire, and traffic.

EdgeConneX is a different project: a hyperscale campus of up to 96 MW, under construction, not described as an off-grid plant. For grid-connected industry, Tomorrow Begins Here points to Texas SB 6. Large loads, 75 megawatts and up at one site, can be ordered to curtail, switch to backup, or be cut when the grid is under stress. The published example of that flexibility is a drop from 100 megawatts to 5, so houses and hospitals stay served. The same account says those customers pay for the substations and lines their load requires. The state chamber says many Texas centers build generation beside the hall, adding supply rather than only taking it, and some can dial back on the hottest days. The state’s economic development office describes the same expectation in policy: in 2026 the Governor directed the Public Utility Commission and ERCOT to verify projects in the interconnection queue, and said growth should add electric capacity, not only demand. The Data Center Coalition’s FAQ says its members pay the full cost of the energy they use, including breakers, transformers, and whole substations. It cites a 2026 study by the firm E3 that found no historical evidence, under existing rate structures, that data centers are what has pushed residential bills up, and that adding them can ease rates for other customers. Virginia’s legislative audit, as the FAQ quotes it, said current rates already assign those costs to the customers who cause them, data centers included.

Myth 05 · Traffic and schools

It will feel like a new town showed up.

A 1,000-home subdivision compared with a data center
Demand1,000 homesData center
Studentsabout 1,500Minimal new enrollment
Morning roadsA subdivision rushMinimal once construction ends
Emergency callsA new neighborhoodOn-site security and fire suppression
Housing marketA thousand new householdsA specialized crew, not a new city

Building Bastrop County’s housing point is the headcount. A permanent staff measured in dozens does not reproduce Austin’s boom. Each construction phase is published at 400–600 jobs, and the lasting technical pay runs $55,000–$130,000+. The value of the building is still the tax roll, not a crowd. Statewide, the Texas Association of Business counts 48,000+ Texans in data center jobs, 38% growth from 2018 to 2024, and about 6 other local jobs supported by each one.

Myth 06 · Taxes

An abatement means they pay nothing.

The land started at about $25,000 a year. That is the number an abatement has to beat, and it is not a close call.

EdgeConneX won its site over 535 others. A ten-year discount was part of landing it. Building Bastrop County reports that during the abatement the county and Bastrop ISD still receive more than $107 million+. Tomorrow Begins Here publishes a separate ISD figure for that proposal: $15.5 million a year, $155 million over ten years. Those lines are not added together. When the discount ends, the full commercial value is what the roll taxes.

Pacifico withdrew its Chapter 312 and JETI applications. It is published at the full rate: $20 million+ a year, described as 30%+ of county revenue, from a $2.2 billion campus. No discount. A commercial bill, and still almost no students.

America First Policy Institute · September 10, 2026

What a community can write into the deal.

This is a national negotiating memo. The examples below are from other places. None of them is a term of the Cedar Creek projects unless Building Bastrop County has already published that term.

Keep the tax stream

The memo treats a one-time donation and a property-tax stream as different assets. Loudoun County, Virginia collected roughly $895 million from data centers in 2025 and cut its residential rate every year for a decade. Analysts estimate that rate would need to be about 91% higher without the revenue. A locality that gives the stream away to buy a headline gift, the memo says, is selling a repeating payment for a lump sum.

Write the water number

Lancaster, Pennsylvania capped municipal water at 20,000 gallons a day per campus and required closed-loop cooling. The memo sets that against facilities that can use up to five million gallons a day. The cap has to be a design requirement, with public reporting, or it is only a hope. Pacifico’s published draw on this site stays the local figure.

Answer the complaint

Gallup’s open-ended question, as the memo reports it, has opponents naming resource use about half the time, quality of life about 22%, and pollution including noise about 16%. Higher utility bills are about 15%. A recreation center or an animal shelter does not quiet a cooling yard. The memo’s list for that complaint is buffers, low-noise cooling chosen at design, and a decibel cap at the property line measured against the sound that was already there.

Read the memo at americafirstpolicy.com

U.S. Department of Energy · July 27, 2026

The same two claims, from the Energy Department.

Assistant Secretary Tim Walsh, who leads the Office of Environmental Management, published this argument in The Washington Times on July 26, 2026. It is a national op-ed. It is not a measurement of the Cedar Creek campuses.

Water

Walsh writes that many modern AI data centers use closed-loop cooling. The same water recirculates through sealed pipes and heat exchangers. Evaporative cooling, the older design, continually uses water and lets it go. He says the closed loop can run without drawing on a community that is under drought restrictions, and that it puts these buildings among the more water-efficient facilities.

Who pays for power

He points to the Rate Payer Protection Pledge: developers commit to pay for new generation and transmission themselves, so those upgrades are not added to the bills of residents and local businesses. He argues that the same investment leaves the wider grid more reliable.

The op-ed offers three places where he says that pledge showed up as a local result:

  • Pike County, Ohio. Department of Energy land, generation financed through a U.S.–Japan trade arrangement, and privately funded grid work. Walsh’s account: lower power bills, a more reliable grid, higher local tax revenue, and thousands of high-paying jobs, without the cost landing on ratepayers.
  • Indiana. An AI data center paid for new transmission lines and substations. He says that raised resilience and lowered electricity costs nearby by cutting outage risk.
  • Georgia. Developers paid to expand local generation. He says the added capacity made the grid more reliable and electricity more affordable for residents.

The rest of the piece is about what the buildings are for. Walsh describes AI used to search medical data, support hospital diagnostics, and model problems in energy, genomics, and materials. At his own agency, he says AI has been used on decades of nuclear-cleanup records to move that work faster and spend fewer taxpayer dollars.

Read the op-ed at energy.gov

The Buc-ee’s comparison is fromBuilding Bastrop County’s site scorecard. The closed-loop water table and the warning against mixing old cooling towers with new halls are fromTomorrow Begins Here.