Skip to content
Bastrop CountyBold
Menu

Sources

Every dollar figure on this site is borrowed, and labeled.

Bastrop Bold does not appraise property and does not speak for the developers. Local figures come from Building Bastrop County and Tomorrow Begins Here. The Department of Energy op-ed, the Texas Association of Business, the Texas Economic Development Corporation, the Data Center Coalition, and the America First Policy Institute memo are statewide or national, and they are labeled that way.

  1. 01

    Local numbers, kept separate

    Building Bastrop County is the local project ledger: investment, abatement status, Pacifico’s full-rate tax, water equivalents, and careers. Tomorrow Begins Here is the broader case: closed-loop water compared with a golf course and a subdivision, the school-funding model, and Texas grid rules. The Department of Energy op-ed is a national argument about closed-loop cooling and developers paying for their own power lines. The Texas Association of Business page is a statewide count — operating centers, construction, jobs, and water. The Texas Economic Development Corporation pages describe the state market, a 2023 jobs-and-income total that includes indirect work, and the expectation that new load come with new power. The Data Center Coalition’s February 2025 Texas tax report is a statewide revenue total, and its FAQ is the association’s national account of jobs, water, noise, and electric bills. The America First Policy Institute memo is a national negotiating guide: closed-loop water written as a number, noise limits at the property line, and the difference between a one-time gift and a property-tax stream. None of those is a Bastrop County appraisal. If a sentence names a Bastrop number, it belongs to one of the first two sources.

  2. 02

    Do not add the tax lines together

    The EdgeConneX abatement total of $107 million+ is what Building Bastrop County says the county and ISD receive during the abatement. Tomorrow Begins Here’s $15.5 million a year, $155 million over ten years, is an ISD projection for that proposal. They overlap in subject and disagree in amount. Pacifico’s $20 million+ a year is a different campus, at the full rate. None of these are a single combined annual check.

  3. 03

    The before-and-after is the point

    The land’s published starting point is $25,000 a year. Every commercial figure on this site is being compared with that, and with the service load of houses — about about 1,500 students and 300,000 to 400,000 gallons a day for a 1,000-home subdivision.

  4. 04

    What this site will not invent

    No homestead savings calculator, no claim that EdgeConneX is off the grid, and no claim that a reported tenant conversation is a signed lease. Pacifico’s on-site plant is described as grid-independent. EdgeConneX’s 96 megawatts are capacity.

Read them yourself

  • Building Bastrop County

    Local project figures, the tax comparison with raw land, Pacifico’s full-rate payment, closed-loop water, careers, and answers to resident concerns.

  • Building Bastrop County · EdgeConneX

    Phase-one and full-buildout investment for the Cedar Creek campus.

  • Tomorrow Begins Here

    Why a rural data center can fund schools without new enrollment, and how ordinary life already depends on this infrastructure.

  • Tomorrow Begins Here · Texas

    Property-tax relief, careers, and industrial customers paying for their own power infrastructure.

  • U.S. Department of Energy

    July 2026 op-ed by Assistant Secretary Tim Walsh on closed-loop cooling and the Rate Payer Protection Pledge. A national argument, not a Bastrop appraisal.

  • Texas Association of Business

    Statewide counts from the state chamber: operating data centers, 2025 construction, jobs, and the share of Texas water those buildings use. Not a Bastrop County appraisal.

  • Texas Economic Development Corporation

    The state’s economic development office on why Texas leads the data center market, and a May 2025 brief on jobs and labor income. Statewide, not a Bastrop County appraisal.

  • Data Center Coalition

    Industry association. Its February 2025 Texas tax report puts 2024 state and local tax revenue in the billions. A statewide total, not the Cedar Creek appraisal.

  • Data Center Coalition · FAQ

    The association’s answers on jobs, water, noise, and who pays for electricity. National and Virginia examples, not a Bastrop appraisal.

  • America First Policy Institute

    September 10, 2026 memo on community-friendly design and on keeping the property-tax stream instead of trading it for a one-time gift. National examples, not a Bastrop appraisal.